GenCost 2020-21: Consultation draft
Graham, Paul
;
Hayward, Jenny
;
Foster, James
;
Havas, Lisa
2020-12-11
Report
81
GenCost is a collaboration between CSIRO and AEMO to deliver an annual process of updating electricity generation and storage costs with a strong emphasis on stakeholder engagement. This is the third update following the inaugural report in 2018 and a second report in 2019-20. The 2020-21 report incorporates updated current capital cost estimates commissioned by AEMO and delivered by Aurecon. Based on these updated current capital costs, projections of future changes in costs consistent with updated global electricity scenarios are also provided. Levelised costs of electricity (LCOEs) are also included and provide a simple summary of the relative competitiveness of generation technologies.
CSIRO
CSIRO publications repository
Electricity, technology, cost, projection
Economic Models and Forecasting; Environment and Resource Economics
Published Version (pdf) (2.34MB)
https://doi.org/10.25919/16j7-fc07
This report has been placed on the CSIRO repository and may be made available to persons outside of CSIRO for non commercial purposes, in its entirety and without deletion of disclaimers and copyright information.
EP208181
Technical Report (Author)
English
Graham, Paul; Hayward, Jenny; Foster, James; Havas, Lisa. GenCost 2020-21: Consultation draft. CSIRO publications repository: CSIRO; 2020. csiro:EP208181. https://doi.org/10.25919/16j7-fc07
PermaLink
Loading citation data...
Citation counts
(Requires subscription to view)