Interim report on the hydroclimate of the Pilbara: past, present and future. A technical report to the Government of Western Australia and industry partners from the CSIRO Pilbara Water Resource Assessment

Select | Print


Charles, Steve ORCID ID icon; Fu, Guobin; Silberstein, Richard; Mpelasoka, Freddie; McFarlane, Don; Hodgson, Geoff; Teng, Jin ORCID ID icon; Gabrovsek, Christina; Ali, Riasat; Barron, Olga; Aryal, Santosh; Dawes, Warrick ORCID ID icon; Van Niel, Tom; Chiew, Francis


2013-08-07


Report


111 pp


CSIRO


Australia


Pilbara


Basin Analysis


Published Version (pdf) (8.89MB)


https://doi.org/10.4225/08/584af3f138fdc


© 2013 CSIRO To the extent permitted by law, all rights are reserved and no part of this publication covered by copyright may be reproduced or copied in any form or by any means except with the written permission of CSIRO.


CSIRO Water for a Healthy Country Flagship


EP134977


Technical Report (Author)


English


1835-095X


Charles, Steve; Fu, Guobin; Silberstein, Richard; Mpelasoka, Freddie; McFarlane, Don; Hodgson, Geoff; Teng, Jin; Gabrovsek, Christina; Ali, Riasat; Barron, Olga; Aryal, Santosh; Dawes, Warrick; Van Niel, Tom; Chiew, Francis. Interim report on the hydroclimate of the Pilbara: past, present and future. A technical report to the Government of Western Australia and industry partners from the CSIRO Pilbara Water Resource Assessment. Australia: CSIRO; 2013.https://doi.org/10.4225/08/584af3f138fdc



Loading citation data...

Citation counts
(Requires subscription to view)